1 / 44
Vivo standing desk leg end cap, upgraded strength — image 1
1 / 44

Vivo standing desk leg end cap, upgraded strength

Order a print of this model

We calculate the final price from your selected file. You review and accept it before payment.

Saved on this device.

bolstered versions of the stock internal end caps

Rating
0 / 5
Likes
4
Downloads
7
Makes
1
Views
91
Reviews
0

Updated at source:

Model information

License
Creative Commons — Attribution — Noncommercial

Compatibility

  • only tested with the model DESK-V100EBY
    • ASM instructions here
    • this is a single motor lifting frame
    • instructions may vary & this part may not be compatible with other lifting frames

Architecture

  • the stock end caps attach to qty 2 side brackets (F)
    • each side bracket is attached to the legs using M6 x 10 CSKS, qty 2
      • nuts are captive inside the end cap
      • this is an end cap, showing the 2 pockets for M6 nuts (*not* locknuts)
  • there are qty 2 end caps per leg
    • there are 2 legs; one is motorized & one is not – the same end cap is reused 4 times throughout the legs
    • the end caps are not meant to be user serviced or accessed, so they don't appear on the instructions

Problem

  • the side brackets take all of the load of the desk weight & things on top of the desk, & loads presented by using the desk
    • in particular, very heavy loads like putting a bunch of monitors at the rear of the desk  & placing substantial weight on the front of the desk causes torque about the width axis of the desk (a nodding or pitch moment)
    • each side bracket transfers this load to qty 2 M6 CSKS, where the head is loaded in shear
  • cyclical loading of leaning on the front edge of the desk & leaving, letting the desk rock backward under the weight of monitors may eventually cause the M6 CSKS to loosen under vibration & further exacerbate the tipping/nodding/pitch problem

Solution

  • I modified the stock end caps to accept
    • for the attachment to the side brackets
      • longer screws for more thread engagement
        • even with the stock hardware, the existing cap prevents the stock screw length from bottoming out & achieving good clamping, as evidenced by this mark on the unit in hand here
      • M6 locknuts
    • for the attachment of the motor (uses M5 hardware)
      • locknuts instead of regular nuts
      • longer screws for more thread engagement
  • fitment of nuts is tightened – it's very easy for the nuts to fall out of the stock pockets

Design

Each end cap is injection molded with relatively simple geometry, but I still managed to require a few iterations to get it right.

Disassembly

  1. lift the leg to extend it
  2. grab the lower leg & push it back down
  3. this will expose the top gearbox which contains the drivetrain that transmits the motorized output into leadscrew output
    1. at this point, the nuts may fall out of the stock end cap
  4. remove the stock end caps by pulling them outward, orthogonal to the leg lift/lower direction

Installation

  1. install new end caps, qty 2 per leg
  2. populate the new nuts
    1. only need qty 2 M6 locknuts for a single leg
      1. populate these in a single end cap
      2. that end cap should face outward so that the side bracket can later attach to it
      3. ensure the nylon insert is closer to the leadscrew – the M6 CSKS must first grab steel threads, not the nylon insert
      4. I added loctite blue to each M6 locknut to further boost holding power over time & to resist loosening due to vibration
        • this is particularly important given that changing out the end caps or changing the nuts for any reason (if the 3DP part breaks) requires extensive disassembly of the desk
    2. you'll need qty 4 M5 nuts or locknuts only for a single leg (install in both end caps going into a single leg) & not both legs because the motor only attaches to a single leg – for my unit
  3. slide the leg up to capture all nuts & surround the end caps up to their flanges
  4. collapse the leg by pushing on the end cap
  5. you are now ready to proceed with the remainder of the MFR instructions.

Part breakdown

Each leg has part hierarchy as follows:

  1. leg
    1. qty 2 end caps
      1. motorized leg
        1. if motorized leg, you'll need qty 4 M5 nuts – that's qty 2 per end cap
      2. non-motorized leg
        1. no M5 nuts required
      3. qty 2 M6 locknuts
        1. install with nylon closer to lead screw of leg
        2. install in the pockets of a single end cap
          1. make sure this endcap is closer to the periphery of the desktop so that side brackets can mount to it
    2. qty 1 side bracket
      1. will mount with qty 2 M6 x 12 mm CSKS (I had these on hand)
        1. this is to improve thread engagement over the stock M6 x 10 mm CSKS

Printing & part prep

  • make sure you fully remove supports to ensure a snug & correct fit
  • mirroring STL not required
  • I tried some PLA print of R2, but it failed once the desk was all installed & with full weight
    • I printed again with ~40% infill, triangles, with a MarkForged Onyx printer with Onyx filament (PA-CF) & reinstalled with much better results
      • I validated the desk lift & lowering function with my full body weight (~140 lbf) on top of the desk weight (~30 lbf) & it worked fine over ~4 cycles
    • conclusion: strong print is required for correct function because considerable weight is borne by the parts

Revisions

  1. don't bother; doesn't work
  2. this one works
  3. SLA optimized with a shell feature – otherwise identical to R2

Toothed washers

Toothed washers for CSKS like these work theoretically also reduce back out over time, but not suitable for this application because we need the CSK head to be loaded in shear to support the weight of the tabletop & things on top.

Tags