1 / 23
800ml Voss bottle lava lamp concrete base GU10 socket
Zamów wydruk tego modelu
Obliczymy ostateczną cenę na podstawie wybranego pliku. Sprawdzisz ją i zaakceptujesz przed płatnością.
Zapisane na tym urządzeniu.
Mold Preparation & Assembly Instructions1. Mold PreparationCoat every part of the mold with a concrete mold release…
- Ocena
- 0 / 5
- Polubienia
- 11
- Pobrania
- 16
- Wydruki
- 0
- Wyświetlenia
- 441
- Oceny
- 0
Aktualizacja u źródła:
Informacje o modelu
- Źródło
- Printables
- Kategoria
- Other Ideas
- Licencja
- Creative Commons — Attribution — Share Alike
SzczegółyPliki (21)Wydruki i komentarze (Wydruki: 0) (Komentarze: 0)Remiksy (0)Kolekcje (8)Powiązane
Mold Preparation & Assembly Instructions
- Mold Preparation
Coat every part of the mold with a concrete mold release agent (e.g., Vaseline) to ensure easy demolding.
- Assembling the Mold Frame
- TheMold Parts 1-4 are secured to theMold Part 1-4 Connector usingM3 screws.
- Once connected, theMold Parts 1-4 are mounted ontoParts 7, 8, 11, and 12 using anM6 x 120-150mm threaded rod.
- Ensure thatwashers are placed at the top and bottom of the threaded rod.
- Secure the assembly withnuts to keep it tightly fastened.
- Securing the Mold to the Base
- TheParts 5-12 are attached to theMold Base using5x20mm pan head wood screws or otherself-cutting screws of similar length and diameter. ***Wrap every visible seam** withpainters tape or duct tape to:
- Prevent concrete leakage.
- Keep the mold securely held together.
- High-Heat Components
- TheGU10 socket screw mount must be printed in ahigh-heat-resistant material (e.g.,nylon) or alternativelycut out of wood.
- TheHeat Thread Insert Holder:
- UsesM3 heat thread inserts.
- Should be made from aheat-resistant material (e.g.,nylon) or alternativelywood dowels.
- If usingwood dowels, secure them with3x20mm wood screws withsmall heads.
- Regardless of the material, aheat-resistant glue (such assilicone or RTV)must be used for bonding.
- Strain Relief
- TheStrain Relief is mounted usingM3 screws.
- These screws secure thestrain relief to thebottom cover. ***M3 heat thread inserts** must be used in thebottom cover to ensure a strong connection.