1 / 2
Bosch Unlimited nozzle holder on-tube — image 1
1 / 2

Bosch Unlimited nozzle holder on-tube

Order a print of this model

We calculate the final price from your selected file. You review and accept it before payment.

Saved on this device.

Bosch Unlimited vacuum cleaner nozzle holder mounted on the tube. I use with BHZUKYD nozzle.

Rating
5 / 5
Likes
8
Downloads
24
Makes
1
Views
316
Reviews
1

Updated at source:

Model information

License
Creative Commons — Attribution — Noncommercial — Share Alike

Holder for Bosch Unlimited vacuum nozzle mounted on the vacuum tube.
 

Additional parts:

  • 2 x M4 nylock nuts (DIN 985)
  • 2 x M4x10 countersunk screws (DIN 965).
    • Depending on your printer, may be M4x12 will be better
  • 1 x M4x16 (or longer) screw, optional, for assembly only.
  • Cyanoacrylate gel or other gel glue for PETG

Print instructions:

  • Select models to print:
    • If you don't have flexible filament (TPU, SEBS, etc), 
      • print model BASE_V2A in PETG
    • If you have Rubber filament (TPU, SEBS, etc), 
      • print model BASE_V2R in PETG
      • print model RUBBER_V2R in rubber
    • If you have BHZUKYD nozzle, 
      • print ATTACH_V2_BHZUKYD
  • DO NOT print BASE_V2* in fragile plastic - you will break it when put on a pipe
  • Use supports in some places:

Assembly instructions:

  • Read to the end.
  • Try to mount nozzle to printed part. 
    • Maybe some knife work will be required to flatten the notch. See the image for explanation
  • Assemble everything before mounting on tube. See video guide. Nuts should be in-place.
    • Maybe you need to apply force to insert nuts into places. You can use longer M4 screws as a puller.
  • Glue in the ATTACH_V2 into BASE_V2* with glue
  • Remove screws.
  • Take the vacuum tube, disconnect it from nozzles and vacuum.
  • Carefully spread the ring, and place it on the pipe.
    • If you printed R models, it's time to attach RUBBER part. Place ribs into grooves.
    • It is possible to preheat the ring in hot boiling water to make it more flexible
    • It is recommended to put the ring on the pipe from the end, passing the electrical connector through the gap in the ring.
  • If you preheated the part, let it cool down before tighten screws
  • Insert and tighten screws.
  • Ensure that when plugging nozzle to holder, screws do not scratch electrical connector.
     

Nut insertion video guide:
note: video guide is for very first model, not presented in files.

Changelog:

  • 2024-11-29. 
    • Added attachment for BHZUKYD nozzle.
    • Added variant for (printable) rubber spacer between tube and plastic
    • Fixed some holes by changing tail of the ring
    • Filled hole in the tube
  • 2024-11-20. Initial release, tested on Bosch Unlimited 6 (tube is ~39.5 mm diameter)

Tags