Caliburn V1 Refresh Cutting, drilling and Hardware Substitute Parts
We calculate the final price from your selected file. You review and accept it before payment.
Saved on this device.
Parts to help not make building one so suck
- Rating
- 0 / 5
- Likes
- 2
- Downloads
- 13
- Makes
- 0
- Views
- 287
- Reviews
- 0
Updated at source:
Model information
- Source
- Printables
- Category
- Outdoor Toys
- License
- Creative Commons — Attribution — Noncommercial — Share Alike
Parts to help make a caliburn v1 refresh.
Front tube cut jig is to help make the cuts on a 1 ½ tube easier than gluing the paper cutouts on. May have to use some blue tape to hold the tube still while cutting.
The ½ od ¼ id tube is for reinforcement with https://www.mcmaster.com/89495K395/ to replace the ½ rod that has to be drilled in the center, which is hard to do without proper tools. This still needs a 6-32 tap to use it though. Also allows for different colors than the rods that are only certain colors.
Trigger link is meant to help line up the holes for https://www.mcmaster.com/4490T171/. The hole being exactly center does not matter in this case.
PVC stock reinforcer tube is meant to have a 5/8 plastic tube reinforcer. Cutting the cutout section with a flush cutter is easy if your tube is soft enough for it.
Jamdoor with 3 holes is Slug's upgraded jamdoor with the tri hole cutouts from sillys jamdoor.