The Lacklosure - The Ultimate Enclosure Box for MK4S (UPDATED version - see at the end)
We calculate the final price from your selected file. You review and accept it before payment.
Saved on this device.
The Ultimate Enclosure box for MK4S based on the original PRUSA IKEA Lack enclosure
- Rating
- 4.5 / 5
- Likes
- 109
- Downloads
- 453
- Makes
- 2
- Views
- 3,213
- Reviews
- 2
Updated at source:
Model information
- Source
- Printables
- Category
- Prusa Parts & Upgrades
- License
- Creative Commons — Attribution — Share Alike


For those who think that the Original PRUSA Enclosure is too expansive, or that it is inconvenient to have a box that prevents 360° access to the printer during maintenance, or who do not want to disassemble or modify the printer's bed just to put it into a box, or who are particularly sensitive to filament fumes (as me) and absolutely do not want to breathe them, then this is the project for you.
I become very sensitive to filament fumes, and since I'm do not own a farm and I print as a hobby at home, it was necessary to do something right away to stop the fumes.
I wanted to build the original PRUSA i3 MK3 enclosure based on the IKEA Lack table but soon I realised that it had some flaws, that should be fixed. So I decided to redesign the whole thing applying the required improvements to the original version.
IMPROVEMENTS
✅ The box is not air tight, so the only way to avoid that fumes exit from the box is to have a lower air pressure in the box, so that air can only enter and not exit. In my case this is done via a suction hose connected to a PWM pump that expels the air out the window via the air conditioner vent.

✅ Even if the box is based on the IKEA Lack table, (55x55) and it seems smaller than the metallic Original PRUSA Enclosure, the additional space inside has been engineered carefully with a clever design trick, so that there is lot of extra space for the bed cable, and it does not require to be dismounted and have the plug replaced with an angular or 90° version. As result the Lacklosure requires less space at home compared to the Original PRUSA Enclosure, and it is ideal for people that do not have space to the big one. The space for the cable has been obtained adding a semi sphere that allows the cable to have enough space to move, and avoid the cable to hit the box.

✅ All the legs have been lengthened to increased box height. Now there is enough space for the PTFE tube to avoid that when the Nextruder is in a high Z position (e.g. > 180) the exiting PTFE tube hits the top covers and create an excessive curvature which creates strong friction in the filament.
✅ The new enclosure internal space size is 55 x 55 x 55 cm. Lot of space 😄.
I think also an MMU3 could be fitted inside, even if I would prefer to install it outside.

✅ The filament is not inserted in a central hole on the top as the original model, but it follows the Original Prusa Enclosure standard (from the right side).
You may choose to swap the panels and have it on left or right, depending your preferences. However if you decide to have the filament inserted from the top centre of the box, you may drill a hole in centre of the top panel and insert the tube from there using this adapter for 1/8" BSP or this one for PC4-M10.
✅ The new legs are stronger and there is no risk that they break when they are not perpendicular.
✅ If you install LED Lights inside, you can connect them through the special SNAP/IN Magnetic connectors, so no need to disconnect any cable when you need to remove the cover shell.

✅ To fully access to your printer, simply unhook the PTFE from the Nextruder and lift and remove the supporting structure cover using the comfortable handles, and the MK4S will remain fully accessible at 360° on the Lack table below, without any hindrance from electrical wires to detach or pins or screws. It take less than 10 seconds.

POSSIBLE CONFIGURATIONS
✅ BASE VERSION (only IKEA LACK and printed plastic. No electrical parts)
✅ ADD-ON #1: LED Lights
✅ ADD-ON #2: FUMES EXTRACTION system towards the outside with Fan
✅ ADD-ON #3: Boxes for tools.
✅ ADD-ON #4: Electrical Plugs & Switches.
✅ ADD-ON #5: Advanced Filtration for PRUSA Core ONE instead of the vacuum tube
✅ Everything else based on your fantasy.
BILL OF MATERIALS:
BASE VERSION
5 Plexiglas panels (3 mm thickness, that should be cut on measure. See the PDF of the cut drawings)
2 IKEA LACK tables.
54 cm PTFE tube 4 mm diam. (PRUSA type)
1 Fitting M5-4 (to connect the PTFE tube to the Nextruder)
2 Spools (at least) of PRUSAMENT ORANGE PETG
Spool of PRUSAMENT JET BLACK PETG
Spool of transparent PETG
Spool of WHITE PETG
8 M6 washers
30 Wood screws M3 20 mm and 25 mm. I suggest to use a kit.
A set of micro screws. It will used to fix object to Plexiglas if you don't want to use glue.
1 bag of Haribo Bears candy😁
TOOLS:
A screwdriver extension to reach the screws down in the plastic part
An electric battery drill with the following tips: 1.5 mm, 2 mm, 2.5 mm, 3.5 mm, 5.5 mm
Wood awl or large nail (50 mm) to mark the hole positions.
A small hammer.
If you want to build the lights LED Lights Add-On, you will need also:
ADD-ON: LED Lights
1 or 2 LED LAMP (12 V) pay attention to the power. Those are 6W and the POWER SUPPLY (12 V) pay attention to the power. This is 24W max.
You can also chose LED strings and power supply like this that has a switch.
5 m Electrical flat double cable 24 AWG
1 Magnetic connector 2 pins no ears. You will have to solder the cable.
1 M3 10mm hex head bolt
13 (+/-) Wood screws M3 20 mm and 25 mm to fix cables. I suggest to use a kit.
TOOLS:
Solder iron to solder the wires to the magnetic connectors.
An electric battery drill with the following tips: 1.5 mm, 2 mm, 2.5 mm, 3.5 mm, 5.5 mm
Wood awl or large nail (50 mm) to mark the hole positions.
A small hammer.
If you want to build the Fumes Extraction System Add-On, you will need also:
ADD-ON: FUMES EXTRACTION forced system towards the outside with Fan
1 Flexible air tube 102 mm diameter for air. As example 2.5 meters depending your site.
1 PWM Vacuum Fan with remote speed controller.
If you want to build the Electrical Plug & Switch BOX Add-On, you will need also:
ADD-ON: Electrical Plug & Switch BOX
2 Power switches with lights (RED and BLUE or whatever color you prefer)
FASTON Medium and Large female crimp connectors. You will need a special pliers to crimp those connectors. If you do not have it I suggest this kit that contains also the connectors.
Spool of PRUSAMENT PETG V0 Jet Black UL-certified self-extinguishing filament.
1 M3 10mm hex head bolt
13 (+/-) Wood screws M3 20 mm and 25 mm to fix cables. I suggest to use a kit.
6 Hex Countersunk Flat Head Bolts M3 10 mm (better a kit like this)
TOOLS:
A crimp pliers to crimp the Faston connectors at the power IEC plugs.
An electric battery drill with the following tips: 1.5 mm, 2 mm, 2.5 mm, 3.5 mm, 5.5 mm
Wood awl or large nail (50 mm) to mark the hole positions.
A small hammer.
If you want to build the Advanced Filtration for PRUSA Core ONE Add-On, you will need also:
ADD-ON: Install the Advanced Filtration for PRUSA Core ONE
1 Advanced Filtration for PRUSA Core ONE.
At the moment I have not created this add-on since It am using the extraction tube, but may be I will install on a second Lacklosure. I will update this project when I will design it.
Since this projects become complex I tried to give you as much more explanation as I could. Printable is full of nice objects that seems easy to realise just because they show the final product and few assembly guidelines, but they aren't 😮.
I want that almost everyone will be able to realise this project at least in the basic version, so taking the example from PRUSA I included a step by step Prusa style guide on how to assemble it.
You can build just the BASIC Lacklosure version without LEDS or Switches or tubes and do not include any additional ADD-ON. It is just the box and it is functional.
Here is presented also the installation of the LED Lights ADD-ON to be connected to the 12V magnetic connectors. The optional LED Lights ADD-ON could be installed using safe ready made LED accessories and power supply on the market.
You will not find any detailed instruction regarding the Electrical Plug & Switch BOX ADD-ON that you see on some photos, since the box involves AC Main voltage assembly.
However the electrical box can be easy built by professional people that have familiarity and skills to build AC high voltage and electrical wiring. ASK the help of a professional to build it.
For this reason I decided to omit this part because of the high safety risk that could involve building it in wrong way.
DO NOT ATTEMPT to build Electrical parts that work on Main 120/220V AC IF YOU ARE NOT AN ELECTRICAL PROFESSIONAL. Even if you know what you are doing, there is always a risk that something will go wrong or you will make a mistake, or something in this document is wrong, If you do so, you do so AT YOUR OWN RISK and I will not take any responsibility.
During the assembly of the box, you can skip all the parts that are related to the LED lights Add-on, wire cabling, and the electrical box assembly and just mount a Basic Lacklosure without any add-on.
ASSEMBLING THE LACKLOSURE:
Start ordering the Plexiglas parts. I found a vendor in my area that was able to CNC cut them at the order. My vendor was not able to do small M2 or M1 holes, so I had not included into the drawings, and I have done them manually with a drill when I needed.
Buy or get all the spare parts of the Bill of Materials.
Print all the plastic parts. I printed almost all of them in PETG Prusament.
If you build the electrical parts you may need to print also:
-- Electrical cable holder fi 10/6,5 mm
-- The Cable holder of the Original Enclosure
FILAMENT COLOURS (these were my preferences):
TRANSPARENT PETG
- The dome
BLACK
- the lid stop
- the LCD Hygrometer support
WHITE
- the fumes exit tube support
ORANGE
- everything else
Almost all the parts have been designed to not require supports, but some will need small supports. Also some parts should be places in a special position on the bed, so I suggest to check the included PrusaSlicer projects for the parts positioning. Almost all big parts were printer at 0.25 Layer heigh because I am impatient…. while some others like the ones that have threads have variable layer heights.
When you receive the Plexiglas, have all the BOM parts, and you have finished to print the plastic parts verify again that you have all they you need; there is nothing more frustrating than being in the middle of assembly and realising that we are missing some screws or pieces.
Now it is time to start: open the Haribo bag and take one, you will need some energy.

Open the first IKEA LACK package, and take the table top. This will be the top of your enclosure. Put it on a table in upside down position.
Start assembling what will be the top leg plastic parts on the Lack top.

Identify correctly the Back Left and Back Right parts (they are the part without the lid pin) and put them on the angles table top. Remember that you are looking at upside down the table probably on what will be the back position. Don't get messed up.
Take an M6 40mm screw and a washer and put the screw in the existing hole. You will have to play to have the screw fitted in the washer and the screw exiting from the hole.
Use a magnetic screwdriver extension to help you.
You will need to use a screwdriver extension in order to screw the screw at the bottom into the plastic leg. Install the two back parts.
Verify they are well aligned.

Continue with the top front parts. You can recognise because they have the rounded pin.

Insert the two lid holders into the plastic pin before screwing the parts. The top parts are these one:

The flat part goes in contact with the wood.
Do the same procedure they you have done for the back parts and screw to the table.

Now it's time of a break, and take the second Gummy bear.

THIS IS AN OPTIONAL STEP FOR THE LED ADD-ON: skip this step if you are not planning to build electrical parts and go to step 15.
I used the electrical parts described in the BOM but you are free to use you own sourced parts. Of course you will have to adapt the assembly steps based on your parts.
The following steps are based on what is in the BOM.
Once you have installed all the four top, install the 12V LED strip lights and the electrical connections using the 2 WAGO connector and the cable holders following the scheme..

I strongly suggest to double check the electrical cabling to avoid any short circuit, and then test the light by powering them and ensure the cabling works.
Start installing the wood legs. Look at the side without the hole. It is crucial you need to identify the exact centre of the leg. Use a pencil to draw lines to identify the exact centre. Then drill a hole using a 3.5 tip. Put the cylinder and use a M4 25 mm screw. Note that the existing hole in the leg is used by the other squared plastic part.

Install all four cylinder, one for each leg doing the same process.
As said, here the precision is crucial. If you have done a bad work you will not be able to fit the cylinders of the leg into the four plastic parts fixed on the table top.
Fit the legs into the plastic parts fixed on the top. You may swap the legs until you find what leg fits better on each plastic support.

Use some paper tape to label each leg and plastic part. It will be useful later when moving and assembling the legs.

Once you are sure of the positions, using a large nail, insert it into the holes at the side of the first leg flaps and hit with a small hammer to mark the hole position into the wood leg.

Repeat the steps for all the four legs.
Remove the wood legs and drill two 3.2 mm holes in the positions marked for each leg.
Place the wood legs into the plastic base. Use the paper tape labels that you have attached before, to identify each leg correct position.
Secure them with with 2 screws M4 20 mm into the holes.
Now we prepare for the electrical soldering of the wires and connectors by relaxing with a new bear.

THE FOLLOWING STEP IS OPTIONAL FOR THE LED ADD-ON: if you are not planning to build electrical parts, identify the bottom right square leg plastic part.

( it is the one with the spaces for the cables) and go to step 34.
OK, you are building the LED Add-on, so take the electrical wire that come from the WAGO directed to the power supply, and bring in an ordered path to the border of the leg. Then drive it up through the leg border till the end of the leg. Add another 5 cm in length on the cable and then cut it.
Disconnect the cable from the WAGO and solder the male magnetic plug.
The magnetic plug is done with strong Neodymium magnets and it is done in this way:
they are attached magnetically and they they can only be connected in one way based on the magnetic field. The magnetic field is extremely string and they can reach each other even over 10 cm in distance. Pay attentions since they will jump uncontrolled on your table.
Here is how they are when detached.
on the male plug, do not confuse the POGO PINS with the solder pins when soldering.
The POGO pins are the shorter and are present only on the male connector.
Solder the wire from the LED to the male plug.
Attach the magnetic female plug. Now, solder the beginning of the spare wire ensuring the polarity is the same. Also here use shrinking tube to secure the electrical contacts after soldering.

Very carefully insert the male plug into the plastic plug in the correct direction.

Use small pliers to keep the plug horizontal while inserting. Push until it reaches the end, and the magnets and the bottom of the plastic connector should be flat. Only the two POGO pins should protrude. Pay attention since they are extremely delicate.
Look at this image of the final installation from below, and note that the connector is flat parallel to the plastic plug:
Identify the bottom right square leg. It is the one with the spaces for the cables.

Rotate it upside down, and insert a squared nut inside the channel (green arrow)

the yellow arrow indicate where the screw will be inserted.
Now align the small plastic plug with the wire, with the hole, and insert an M3 10 mm hex head bolt into the hole (yellow arrow).
The screw should be between the two wires. Play around until you are able to screw it, just few turns. Don't screw completely, you will aligned later.
Here is how it will appears once it is installed:
Now it's bear time again. While you enjoy the candy, reread all the past steps to check if something just skipped or not performed as intended.

Now put the the bottom right square leg on the top of what will be the back right leg, and using an M6 30mm screw and a washer temporary install. Do just few turns.
Route the wire around the leg in a nice way. You can also use the wire cover for the orange part if you like.
Identify all the others bottom squared plastic parts, and put them on the top (do not screw yet) of the wood legs over the original centre holes. Keep attention to position the top lid parts (with pin) on the front legs and the parts without pins on the back legs. Ensue the left and right squared block with the lid pin are correctly positioned. Label all of them with paper tape.

Double check that the parts are correctly positioned. This part is very misleading and can lead to install the wrong part in the wrong leg, and then to rework to fix the issues.
Look how the front parts should appear ( remember that the table is turned upside down, those will be at the bottom when you finish the installation.
You may fix the plastic parts with a M6 30 mm screw. Do not screw it completely. Just few turns.
Now position the back Plexiglas. Pay extreme attention since it will be unstable and any bend will break the plastic part. This will ensure that the measures are correct and the Plexiglas have been cut correctly. If it fits well, continue.
Lift the Plexiglas slightly and insert the holder underneath, then insert the Plexiglas into the groove, then lower the Plexiglas.
Place the holder exactly in the centre. I suggest to take measures to do a precise work.
Stop with paper tape so that does not move. Using a large nail, insert it into the holes at the side of the plexiglas holder and hit with a small hammer to mark the hole position.
Remove the plexiglas. Remove the tape and the holder. Drill 2.5 mm holes in the positions marked. Reposition the holder and install it with 2 screws M3 20 mm.
It should appear as in this image:
Now you can play with the top plastic legs and moving them ensure the plexiglas is fit into the triangular cuts.
Move to the right side. As in the previous steps, place the right Plexiglas to ensure it fits. Now position the Plexiglas so that it is centred inside the triangular borders, and there is the same distance on each part (around 1 or 2 mm).

Now place the plastic handle, and put exactly centred in the space of the Plexiglas. Ensure again the Plexiglas is also at the same distance in the corner.

When it is centred, stop it with paper tape so that do not move. Remove the Plexiglas. Using the large nail, insert it into the holes at the side of the plexiglas handler and hit with a small hammer to mark the hole position.
Remove the plexiglas. Remove the tape and the holder. Drill 2.5 mm holes in the positions marked. Reposition the holder and install it with 2 screws M3 20 mm.
Position the handler enforcer side by side on the handler and trace the holes with the nail.

Drill 2.5 mm holes in the positions marked. Reposition the enforcer and install it with 2 screws M3 20 mm and 2 M3 30 mm.
Take the small filament input box and screw the small Pneumatic fit PC6-¼ inches.
The part has the correct threads, so it will be be easy.
Position the cube with the Pneumatic fit below, and put the small cone into the upper hole and position as in the picture. It should touch the end of the lower metal fit.
Now screw in the Pneumatic fit PC4-M10 on the top. The cube is assembled.
Position the Plexiglas and fit the part user the Plexiglas cut, ensuring is centred. Check that the Plexiglas is centred in all the parts.

When it is centred, stop it with paper tape so that do not move. Remove the Plexiglas. Using the large nail, insert it into the holes at the side of the plexiglas handler and hit with a small hammer to mark the hole position.
Remove the plexiglas. Remove the tape and the filament input. Drill 2.5 mm holes in the positions marked. Reposition the holder and install it with 2 screws M3 20 mm.
Repeat the steps from 25 to 30 for the left side.

note that if you are not building the LED Add-on you not have the LED lights that you see in the upper image.
Now you can screw the two M6 on the back legs.
Take the dome and the dome ring. Insert the dome into the Back plexiglas hole. It should be on the outside part. Screw the dome ring to block the dome to the Plexiglas.
Note that that the thread is REVERSED and therefore you have to UNSCREW to screw in.
Do the same for the air exit tube holder.

Take the bottom front lid supports.

Play with the upper legs and insert them into the pins.
You can unscrew the M6 if this facilitate the task.
Take the two front doors Plexiglas and slide them into the support lids. Place the open handles. They will not stay in place. You will need to use glue or micro screws.

In my case I used several micro screws. One for each part was enough.

Install the magnetic doors stopper. I created many versions due to lack of the correct magnet size. Attach the metal part using two M3 flat head bolts and two nuts.

There are 3 versions: A, B, C since I had difficulties to source magnets and metals.
Choose what is better for you.
Open the doors and then place it exactly in the centre in a way it support the closure.


Using a large nail, insert it into the holes at the side of the stopper and hit with a small hammer to mark the hole position.
Remove the stopper. Drill 2.5 mm holes in the positions marked. Reposition the stopper and install it with 2 screws M3 20 mm.
Now you can tighten all M6 screws.

Now you can put the shell in the correct position on a table. Take if from the handlers.

While you look at your masterpiece, it time for a new energy load.

BASE TABLE INSTALLATION
Open the second IKEA LACK package. Start by assembling the IKEA LACK following the instructions. The assembly should be perfect. I suggest to use and electric screwdriver and clamp the double screw with the adjustable chuck, and screw the screw perfectly vertically into the base of the table. Then put the leg on it and manually screw it keeping it 90° as much you can while you are screwing. In this way you will have perfect legs.
Here is allowed an extra gummy bear. 😉
Put the squared cones on the table aligned with the table borders.

The front cones have a rounded part as in the picture below.
The back left cone is normal. The back right cone has the rectangular plug and the space for the power cable. Look below the correct placement position of the back right cone related to the table.
Place them carefully, and put the M4 20mm screw in the central hole. Hit with an hammer so that they mark the table surface.
Drill 4 holes using a 3.3 mm tip. You have only one chance here. Take your time and make them perfectly aligned.
Install them using 3 M4 20mm screws.
This is the moment to try how the shell fits: take it from the handles and put it on the table. The cones should fit perfectly in the negative cone of the legs and the structure should be stable and squared.

If you notice any defect, work on it until is solved.
Now open the doors, take the 3 Plexiglas holders and place them under the Plexiglas of the left, back, and right panels. You will need to lift a little the shell. Use always the handlers.
Place the holders exactly in the centre of the panel. I suggest to take measures to do a precise work. Stop with paper tape so that does not move. Using a large nail, insert it into the holes at the side of the plexiglas holder and hit with a small hammer to mark the hole position.
Remove the Box shell. Remove the tape and the holder. Drill 2.5 mm holes in the positions marked. Reposition the holder and install it with 2 screws M3 20 mm.
It should appear as in this image.
Now install again the shell on top, and verify all is fine.

If it is fine, take your time for this goal. It is Haribo time again.

THE FOLLOWING STEP IS OPTIONAL FOR THE LED ADD-ON: if you are not planning to build electrical parts, go to step 127.
Remove the Lacklosure shell. Always use the handler to pick up the box.
Insert the big nails into the centre of the connector hole of the back right cone. Hit with the hammer to mark the sign.

Remove the screw of the Back Right cone with the plug and remove the plastic cone.
Drill a hole with a 4 mm tip in the IKEA Lack where there is the marked point. Clean up the hole with a blade and use a black Pentel pen to refine all black again.
Insert the second magnetic plug with the spare wire inside the rectangular connector of the cone from downside. Try to use small pliers to do that.

Be sure the connector is horizontal and when exit is aligned to the top surface.
Try a way to insert the wire inside the hole on the top of the table and reach the bottom. The wire should exit below the table. You can use 20 cm of spare filament and some scotch to fix the wire to the filament to allow an easy pass through in the table.
Put in the cone in position again, and reinstall the central screw.
Here is how it should appear.
Put the cover box on the top. Ensure is aligned and all the Plexiglas are inside the holders.
Now its is the moment to carefully align the two magnetic connectors on the back right leg, and tight the wire to stop the position.
Ensure the small connector with the screw on the back right leg is perfectly in contact with the one on the lower cone. Play around with them until you see well aligned.

Tighten the screw to fix the connector in position. Feel free to arrange the wire that is coming down from the leg in a nice way.
Put the wire cover on the connector.
Remove the Lackclosure top.
Now put the bottom Lack table side down.
It is time of relax and think again while you enjoy a candy.

If you did not build the LED ADD-ON skip to step 102 now.
ADD-ON: LED Lights
Install the Power supply that gives the 12V to the LED.
Install the 12V power supply using double tape on the back of the Lack. You may decide also to drill and use screws.

Connect the LED wire you have just moved down from the hole to the 12V output 24W power supply exit.
Fix the cable under the table using the printed cable holders.
Using a Multimeter ensure you did not create any short circuit, and that all the contact are conducing. Check especially the wires that come from the led lamp to the first magnetic plug male, and then from the female to the 12V power supply.
If you did not build the Electrical Box ADD-ON skip to step 119 now.
ADD-ON: Electrical Plug & Switch BOX
This is just the mechanical assembly overview of the Electrical box. There are no cabling instructions.
Take the electrical box you have printed. Better to have printed it using a UL-certified self-extinguishing material like PRUSA Jet Black PETG V0
Perform all the wiring by yourself.
Start by inserting the IEC plugs and the switches. They will just snap in the box.

The Red switch turns ON/OFF the main voltage either to the printer and to the LED AC power supply. The Blue switch turns ON/OFF the Main on the 12V Power supply.
The cable from the wall Main plug will be connected to the male IEC plug (PC type cable).
The IEC female plug will be connected to a IEC M/IEC F cable that goes to the printer.
Put 6 squared nuts into the box cuts, and insert the 6 M3 10 mm hex bolts with flat head just for few turns, to avoid that the nuts jump around.

Connect all the wiring. The red switch is the main power, the blue switch turn on the power to the 12V power supply and as result the LED will be on.
Remove the screws, and place the cover, carefully avoiding the nuts go around,and then screw the screws.
The exit wires will be connected to the LED Power Supply AC main input.
Print (on paper) the hole mask PDF, cut the rectangles, and position them either on the box and on the back of the table to understand the corresponding positions. You will use it with the big nail and the hammer to mark the positions for the screws that will hold the box. The red arrows indicate the hole positions.

You will need big head screws. To fix the box, screw the the 4 top screws and leave the head at least 4/5 mm from the wood. Put the box over the big screws, and the heads should fit into the big holes.
Pull the box in the direction of the back side, and the box should become fixed to the table. If this do not happen, remove the box and regulate the height of the screws.
As you see below the space between the head and the table should the the height of the box face.
You will have to improvise since you will have the wire from the magnetic switch that exit exactly under the box, so you will have to arrange the wire and be able to mount the box in a stable way. Unfortunately I missed my 90° screwdriver so I could not install the 3 screws on the side to fix the box as I intended, but I realised that installing just one, even not perfectly 90° was enough to block the box. Definitely an area for future improvements.
Now put the box cover on top of the base table.

Check again with the multimeter that the cabling from the led lamp through the magnetic connector and to the 12V power supply works as expected.
If you built the Electrical Plug & Switch BOX, ensure you have not done any mistake and check for shorts before connecting the box to the Main AC power. Test that it works as you intended.
If you did not built the LED ADD-ON skip to step 125
If you have not built the Electrical Plug & Switch BOX, connect your power supply for the LED to the wall plug and turn it on using the switch supplied with your power supply. It may have even an remote command.
LED Lamps should turn on. If they don't:
- remove the cover shell
- measure the voltage on the magnetic connectors on the lower cone, and ensure it has 12 V. If not, review the wiring until you find the cause.
- Put the shell box on the top.
- Check with the multimeter if you have 12V on the LED WAGO wires, and that the polarity is correct.
- if you don't have any voltage, play around with the screw of the plug and try to ensure it does magnetic contact.
If all works, we are almost at the end.
Remove the top cover.
Bring the lower lack table to your final destination room.
Put the MK4S printer on it.

ONLY for the Electrical Plug & Switch BOX ADD-ON use the orange M/F cable to connect the MK4S power supply to the female IEC connect on the electrical box.
If you did not build the electrical box, then connect the standard power cable to the MK4S and the cable will be black. The route of the cable in the leg will be the same.
Insert the power cable from the power supply into the cuts of the back right cone.

Fix it in straight position so that does not create problem when you put the top cover by using a printed cable press and fix it with a screw.
Use epoxy or Super glue to glue the Neodymium magnets into the door handlers.

THE FOLLOWING STEP IS ONLY FOR THE LED ADD-ON: if you are not planning to build electrical parts, go to step 137.
Ensure you route correctly the new short printer cable (in orange) through the leg cut, and that it does not lift the shell as in the image below:

TIME TO EAT ALL THE REMAINING SWEETS

Your LACKLOSURE Box is complete. 😄
ADD-ON: FUMES EXTRACTION forced system towards the outside with Fan
Print the window hole tube adapter. You may need your custom part, based on your windows size hole.
Take the first flexible air tube and connect it to the Lacklosure fume exit.

do not forget to tighten the metal clamp (showed by the yellow arrow).
A small pressure should be enough or you will damage the parts.
Connect the other side of the flexible air tube to the PWM fan (the one with the yellow arrow)

Ensure the flow of the air of your fan is the same of the blue arrow.
I suggest to test the direction of the air by turning on the fan for few seconds before connecting the tubes. The air should go from the box to the window.
Connect the second flexible air tube to the other side of the fan (the green arrow)
Connect the other side of the second tube to the window tube adapter.
Connect the Tube adapter to your window hole.

Your system is ready. I suggest to keep the PWM fan speed to the minimum (1).
Avoid to use fans that have no levels or HIGH/LOW speed switch only.
(*) UPDATES
UPDATE 2026-05-28
(Updated the PTFE pass through cube
There was a persistent issue when a filament coming from the 6 mm external PTFE was entering into the access cube that change the diameter to 4 mm PTFE. The filament simply stuck in too often!
Just reprint the PTFE_In_Out_V2-Prj.3mf project and follow step 50 to assemble it.